GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 287
8-11-9-2
Capacitor Pack installation
4.
Unlatch the two latches (
1
) that clamp the
Capacitor Pack to the top of the BEP (
2
).
Tilt the Main Console Front Cover forward
just until the lower Column Cover stop tabs
(
3
) clear and slide the Shear Wave Console
Cover Assembly (
4
) out.
Lift the Column Cover Assembly.
Push the Capacitor Pack toward the Card
Cage approximately 1/2 inch to free the
Pack the BEP.
Remove the Capacitor Pack.
Table 8-178 Capacitor Pack Installation
Steps
Corresponding Graphic
1.
Place the Capacitor Pack on top of the
BEP.
Reconnect the power cable from the Main
Power Supply to the Pack
BCM1
and
BCM2
. Power Cable is labeled.
Table 8-177 Capacitor Pack removal
Steps
Corresponding Graphic
Содержание LOGIQ E9
Страница 1: ...12 13 18 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL VERSION R6 Part Number 5573152 100 Revision Rev 2 ...
Страница 2: ......
Страница 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Страница 140: ...DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 50 Section 4 8 Site Log This page was intentionally left blank ...
Страница 753: ......
Страница 754: ......