GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 76
Section 8-5 - Replacing Covers and Bumpers
8-5-20-6
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
8-5-20-7
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
8-5-20-8
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all required checks and is ready for use.
Table 8-50 Main Cable Cover replacement Functional Checks
See:
Section
Functional Check
Debrief Script
LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all
required checks and is ready for use.
Brakes and Direction Lock Checks
Operator I/O Movement - XY and Z
Mechanism
Содержание LOGIQ E9
Страница 1: ...12 13 18 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL VERSION R6 Part Number 5573152 100 Revision Rev 2 ...
Страница 2: ......
Страница 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Страница 140: ...DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 50 Section 4 8 Site Log This page was intentionally left blank ...
Страница 753: ......
Страница 754: ......