GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 280
Section 8-11 - Peripherals replacement
5.
Carefully position the Bracket - Printer
Mount onto the Z-Mech and begin to
re-install one of the T30 torx screws with
one of the M6 External Toothed Lock
Washer, provided in the Kit.
6.
Re-install the second T30 torx screw and
the second M6 External Toothed Lock
Washer, provided in the Kit. Torque 4.3 Nm
(3.2 lbf-ft {38 lbf-in}).
Remove the liner from the Cable Tie Mount,
position as shown and press, firmly into
place as shown.
Secure the Drive Gear Assembly power
cable to the Cable Tie Mount. Trim the
excess Cable Tie.
7.
Re-install the Top Cover, but DO NOT
install the screws.
MAKE SURE the Printer USB and Power
Cables are routed properly (as shown) and
DO NOT get pinched.
Cables positioned correctly.
Table 8-173 Printer Bracket installation
Steps
Corresponding Graphic
Содержание LOGIQ E9
Страница 1: ...12 13 18 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL VERSION R6 Part Number 5573152 100 Revision Rev 2 ...
Страница 2: ......
Страница 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Страница 140: ...DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 50 Section 4 8 Site Log This page was intentionally left blank ...
Страница 753: ......
Страница 754: ......