GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 5 Components and Functions (Theory)
5 - 13
5-3-3-2
Top Console block diagram - R4.x
5-3-3-3
Input Signals
•
On/Off Switch and LED
•
DVI Video for the Main Monitor
•
+48 VDC power for the electronics
•
Audio (Stereo) for the speakers
•
USB line dedicated to the Touchscreen Video
5-3-3-4
Bidirectional Signals
•
USB for Op Panel uses a USB HUB with 7 outlets:
-
2 x USB connector on the Bulk Head (one goes to main monitor; other is spare
-
2 x USB connectors on the Operator Panel
-
USB for the Trackball
-
USB for the Alphanumeric Key Board
-
USB for the Switch Board Rotary Devices and the touch “keys” on the Touch Screen
5-3-3-5
Fuses, Jumpers, DIP-switches and LEDs
Dip Switches on the Trackball. Refer to Chapter 8.
Figure 5-6 Top Console block diagram - R4.x
OP PANEL
REG
5V
12V
3.3V
CONTROLLER BOARD
BULKHEAD
BOARD
48V
USB
USB
AUDIO
uP
3.3V
KEYBOARD
USB
HUB
5V
USB
ON/
OFF
10.4"
LCD
+12V
HV
I
NV
USB
UP/DN/LOCK
BUTTONS
TRACKBALL
SWITCH
BOARD
+12V
+5V
GEL WARMER
TEMP
CONTROL
MAIN LCD
DISPLAY
BULKHEAD
PLATE
DVI VIDEO
48V POWER/AUDIO
USB FOR OP PANEL
USB FOR VIDEO ON TOUCH PANEL
UP/DN/BRAKE/RELEASE SWITCHES
MAIN CABLE
MEMORY STICK
MICROPHONE
USB/
VIDEO
TOUCH
G
U
+48V
5V
P7
P8
P1
P2
P3
P4
J24
J22
J21
J25
J23
J18
J19
J15
J1
P5
P6
L
5V FROM J21
5V FROM J22
5V
FLAT
SCREEN
+12V
HV INV
USB
HUB
USB/
AUDIO
MIC
5V
48V
5V
REG
12V
USB
VIDEO
CNTL
E
NOT
USED
TO/FROM
MAIN
CONSOLE
CABLE: D
NOT INSTALLED
STARTING
APRIL 2014
Содержание LOGIQ E9
Страница 1: ...12 13 18 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL VERSION R6 Part Number 5573152 100 Revision Rev 2 ...
Страница 2: ......
Страница 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Страница 140: ...DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 50 Section 4 8 Site Log This page was intentionally left blank ...
Страница 753: ......
Страница 754: ......