GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 7 Diagnostics/Troubleshooting
7 - 39
Name: GFE Access Test
Description: Reads the version of the GFE FPGA
Run Time: 00:01
If this test failed:
1.) Replace the GFI board.
Name: Relay LVDS Test
Description: Tests the LVDS connection between the GFI interface and the GRLY
Run Time: 00:02
If this test failed:
1.) Swap GFI boards and/or GRLY board to determine which board has failed.
2.) Replace the failed board.
Name: GFI Fan Test
Description: Test Front End card rack fan control and fan speed measurements
Run Time: 00:40
If this test failed:
1.) Check fan drawer in Front End Card Rack. Verify connection with backplane. Replace defective fan.
2.) Replace GFI board.
Name: GFI GTX Test
Description: Test communication with the GTX Board. (Same as the GFI Memory Test)
Run Time: 00:03
If this test failed:
1.) Based on failure information, replace the failed GTX or swap the GTX boards to isolated failure.
Name: GFI Fixed Demod Test
Description: GFI Fixed Demodulator signal path test. (Similar to the FDEMOD test with a slight variation
on how the test is run.)
Run Time: 00:03
If this test failed:
1.) Replace the GFI board.
Содержание LOGIQ E9
Страница 1: ...12 13 18 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL VERSION R6 Part Number 5573152 100 Revision Rev 2 ...
Страница 2: ......
Страница 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Страница 140: ...DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 50 Section 4 8 Site Log This page was intentionally left blank ...
Страница 753: ......
Страница 754: ......