GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 307
8-12-6-1
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
8-12-6-2
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Connect cables and Probes you removed earlier
2.) Power up the LOGIQ E9 to verify that it operates as intended.
8-12-6-3
Functional Checks
Perform the following functional checks to confirm the LOGIQ E9 is operational before returning the
LOGIQ E9 to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all required checks and is ready for use.
NOTE:
Be sure to inform the customer that the On-Board V Nav Stand SHOULD NOT be used to push
the LOGIQ E9.
Table 8-188 Side Covers replacement Functional Checks
See:
Section
Functional Check
Debrief Script
LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all
required checks and is ready for use.
Содержание LOGIQ E9
Страница 1: ...12 13 18 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL VERSION R6 Part Number 5573152 100 Revision Rev 2 ...
Страница 2: ......
Страница 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Страница 140: ...DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 50 Section 4 8 Site Log This page was intentionally left blank ...
Страница 753: ......
Страница 754: ......