GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
3 - 4
Section 3-3 - Receiving and unpacking the equipment
Section 3-3
Receiving and unpacking the equipment
3-3-1
Purpose of this section
This section describes how to receive and unpack LOGIQ E9.
3-3-2
Receiving and unpacking warnings
CAUTION
TWO PEOPLE ARE NEEDED TO UNPACK THE UNIT BECAUSE OF ITS WEIGHT.
ATTEMPTS TO MOVE THE UNIT CONSIDERABLE DISTANCES OR ON AN INCLINE BY
ONE PERSON COULD RESULT IN INJURY OR DAMAGE OR BOTH.
TWO PEOPLE ARE REQUIRED WHENEVER A PART WEIGHING 16 KG (35 LBS) OR
MORE MUST BE LIFTED.
CAUTION
REMEMBER TO USE RELEVANT PERSONAL PROTECTING EQUIPMENT (PPE) DURING
PACKING/UNPACKING. CHECK WITH YOUR LOCAL EHS REPRESENTATIVE.
Содержание LOGIQ E9
Страница 1: ...12 13 18 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL VERSION R6 Part Number 5573152 100 Revision Rev 2 ...
Страница 2: ......
Страница 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Страница 140: ...DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 50 Section 4 8 Site Log This page was intentionally left blank ...
Страница 753: ......
Страница 754: ......