GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 124
Section 8-6 - Replacing Top Console Parts
8.
OLED
Monitor and Bulkhead Board
P/N 5492372.
Connect the Monitor cables; the Power/
USB Cable (
P3
) and the HDMI (
P10
). See
Bulkhead layout in Step 7 for reference.
Go to Step 10.
OLED Monitor - R6 and later
9.
After plugging in the Monitor Cable, bend
the cable as shown, pull with your index
finger and push with your thumb. The “S”
bend allows the cable to flex in the up
direction when the Bulk Head Cover is
installed.
R5 only
10. Install the Bulkhead Cover.
11. Re-install the Monitor.
12. Perform Functional Checks. See:
8-6-3-4 - Calibration and adjustments
,
and
8-6-3-6 "Functional Checks" on page 8-125
.
Table 8-75 Monitor Arm assembly (Ergotron) installation - R5 and later production
Steps
Corresponding Graphic
Содержание LOGIQ E9
Страница 1: ...12 13 18 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL VERSION R6 Part Number 5573152 100 Revision Rev 2 ...
Страница 2: ......
Страница 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Страница 140: ...DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 50 Section 4 8 Site Log This page was intentionally left blank ...
Страница 753: ......
Страница 754: ......