D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
4 - 2
Section 4-2 - General procedures
Section 4-2
General procedures
4-2-1
Overview
Some procedures are used more often than other. The intention with this section is to keep the most
used procedures in one place.
NOTICE
SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place. The covers
are required for safe operation, good system performance and cooling purposes.
NOTICE
Energy Control and Power Lockout for LOGIQ E9
WHEN SERVICING PARTS OF THE SYSTEM WHERE THERE IS EXPOSURE TO VOLTAGE
GREATER THAN 30 VOLTS:
1. TURN OFF THE SCANNER.
2. UNPLUG THE SYSTEM.
3. MAINTAIN CONTROL OF THE SYSTEM POWER PLUG.
4. WAIT FOR AT LEAST 20 SECONDS FOR CAPACITORS TO DISCHARGE AS THERE ARE NO
TEST POINTS TO VERIFY ISOLATION. THE AMBER LIGHT ON THE OP PANEL ON/OFF BUTTON
WILL TURN OFF.
5. DISCONNECT THE EPS BATTERY AT J3, OR THE BATTERY FROM THE CHARGEBOARD AT
PC N3 WHEN WORKING IN THE BEP. BEWARE THAT THE MAIN POWER SUPPLY, EPS OR
CHARGEBOARD AND BEP MAY BE ENERGIZED EVEN IF THE POWER IS TURNED OFF IF THE
CORD IS STILL PLUGGED INTO THE AC OUTLET.
Signed
Date
TAG
&
LOCKOUT
Содержание LOGIQ E9
Страница 1: ...12 13 18 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL VERSION R6 Part Number 5573152 100 Revision Rev 2 ...
Страница 2: ......
Страница 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Страница 140: ...DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 50 Section 4 8 Site Log This page was intentionally left blank ...
Страница 753: ......
Страница 754: ......