GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 123
NOTICE
DO NOT connect the Monitor power cable to the power (P2) or (P3) connector on the Bulkhead
when the LOGIQ E9 is powered up. Damage to the Monitor Power Cable and/or the Bulkhead
Board can occur. See images below of damage that can occur.
48VDC pin in the P3 connector (center pin), shows damage.
The outside two pins are Ground. Cable left, Bulkhead Connector right.
6.
23 inch
Monitor and Bulkhead Board
P/N 5492372. If OLED, go to Step 8.
Connect the Monitor cables; Video (
P10
),
power/USB (
P2
) to the Monitor and
accessory USB (
P3
) to the Bulkhead Board
(USB lower port). See Bulkhead layout in
Step 7 for reference.
Go to Step 10.
Monitor Cables to Bulkhead
23 inch - R6 and later
7.
R6 and later Bulkhead Board
(P/N 5492372)
P1
= 48V Gel Warmer power
P2
= 48V/USB (power and accessory USB
for 23 inch Monitor)
P3
= 48V/USB (power and accessory USB
for OLED Monitor {USB, lower portion of
port is used for USB for 23 inch Monitor})
P10
= video (HDMI)
A
= Bulkhead ground
Table 8-75 Monitor Arm assembly (Ergotron) installation - R5 and later production
Steps
Corresponding Graphic
Содержание LOGIQ E9
Страница 1: ...12 13 18 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL VERSION R6 Part Number 5573152 100 Revision Rev 2 ...
Страница 2: ......
Страница 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Страница 140: ...DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 50 Section 4 8 Site Log This page was intentionally left blank ...
Страница 753: ......
Страница 754: ......