GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 122
Section 8-6 - Replacing Top Console Parts
NOTICE
DO NOT connect the Monitor power cable to the power (P3) connector on the Bulkhead when
the LOGIQ E9 is powered up. Damage to the Monitor Power Cable and/or the Bulkhead Board
can occur. See images below of damage that can occur.
48VDC pin in the P3 connector (center pin), shows damage.
The outside two pins are Ground. Cable left, Bulkhead Connector right.
5.
For R5 production Bulkhead Board
:
19 inch
Monitor and Bulkhead Board
P/N GA200290 or P/N 5482676.
Connect the Monitor and Arm cables: Arm
ground Cables (
Aa
) and (
Ab
) to the ground
on the Bulkhead (
A
) first, Video (
P10
) and
power/USB (
P3
) to the Monitor.
If the Video Cable has a retainer and screw.
Tighten the screw with a small, flat blade
screwdriver.
Make sure the cables do not interfere with
the installation of the cables. It may be
necessary to push the cables up before
installing the Bulkhead Cover.
Go to Step 9.
Monitor Cables to Bulkhead - R5
Table 8-75 Monitor Arm assembly (Ergotron) installation - R5 and later production
Steps
Corresponding Graphic
Содержание LOGIQ E9
Страница 1: ...12 13 18 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL VERSION R6 Part Number 5573152 100 Revision Rev 2 ...
Страница 2: ......
Страница 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Страница 140: ...DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 50 Section 4 8 Site Log This page was intentionally left blank ...
Страница 753: ......
Страница 754: ......