xxiv
Operating Environment Precautions
4
!Caution
After programming (or reprogramming) using the IOWR instruction, confirm
that correct operation is possible with the new ladder program and data before
starting actual operation. Any irregularities may cause the product to stop
operating, resulting in unexpected operation in machinery or equipment.
!Caution
The CP1H CPU Units automatically back up the user program and parameter
data to flash memory when these are written to the CPU Unit. I/O memory
(including the DM Area, counter present values and Completion Flags, and
HR Area), however, is not written to flash memory. The DM Area, counter
present values and Completion Flags, and HR Area can be held during power
interruptions with a battery. If there is a battery error, the contents of these
areas may not be accurate after a power interruption. If the contents of the
DM Area, counter present values and Completion Flags, and HR Area are
used to control external outputs, prevent inappropriate outputs from being
made whenever the Battery Error Flag (A402.04) is ON.
4
Operating Environment Precautions
!Caution
Do not operate the control system in the following locations:
• Locations subject to direct sunlight.
• Locations subject to temperatures or humidity outside the range specified
in the specifications.
• Locations subject to condensation as the result of severe changes in tem-
perature.
• Locations subject to corrosive or flammable gases.
• Locations subject to dust (especially iron dust) or salts.
• Locations subject to exposure to water, oil, or chemicals.
• Locations subject to shock or vibration.
!Caution
Take appropriate and sufficient countermeasures when installing systems in
the following locations:
• Locations subject to static electricity or other forms of noise.
• Locations subject to strong electromagnetic fields.
• Locations subject to possible exposure to radioactivity.
• Locations close to power supplies.
!Caution
The operating environment of the PLC System can have a large effect on the
longevity and reliability of the system. Improper operating environments can
lead to malfunction, failure, and other unforeseeable problems with the PLC
System. Make sure that the operating environment is within the specified con-
ditions at installation and remains within the specified conditions during the
life of the system.
Summary of Contents for CP1H-CPU - 05-2006
Page 2: ...CP1H X40D CP1H XA40D CP1H Y20DT D CP1H CPU Unit Operation Manual Revised May 2006...
Page 3: ...iv...
Page 11: ...xii TABLE OF CONTENTS...
Page 15: ...xvi...
Page 19: ...xx...
Page 31: ...xxxii Conformance to EC Directives 6...
Page 71: ...40 Function Blocks Section 1 5...
Page 133: ...102 Computing the Cycle Time Section 2 7...
Page 169: ...138 CPM1A Expansion I O Unit Wiring Section 3 6...
Page 411: ...380 Clock Section 6 8...
Page 519: ...488 Replacing User serviceable Parts Section 10 2...
Page 527: ...496 Standard Models Appendix A...
Page 535: ...504 Dimensions Diagrams Appendix B...
Page 628: ...597 Connections to Serial Communications Option Boards Appendix F Connecting to Unit...
Page 629: ...598 Connections to Serial Communications Option Boards Appendix F...
Page 659: ...628 PLC Setup Appendix G...
Page 665: ...634 Index work words 159 write protection 370...
Page 667: ...636 Revision History...