background image

 

 

Silvertel 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rev 1.0 – June 2010 

 

 

 

 

 

 

 

Ag102 Evaluation Board 

User Manual 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for Ag102

Page 1: ...Silvertel Rev 1 0 June 2010 Ag102 Evaluation Board User Manual...

Page 2: ...n 2 4 1 Input 2 4 2 Output 3 4 3 Capacity Selection 3 4 4 Simulated Thermal Offset 4 4 5 Status Output 4 5 Using the Board 6 6 EVALAg1x2 Evaluation Board Schematic 7 2 Table of Figures Figure 1 Board...

Page 3: ...ange of 9V to 36V and will charge SLA batteries with a capacity between 1 2Ah and 7Ah 4 Board Description 4 1 Input The input power is supplied to the board through connector J12 see Figure 1 this is...

Page 4: ...the corresponding jumper link on J6 see Figure 2 and Table 1 Figure 2 Capacity selection link J6 Resistor Selection RCS Resistance Ohms 1 Battery Capacity Ah Min Input Voltage V Bulk Charge Current Li...

Page 5: ...OFF and the over temperature error LED 5 will illuminate Opening one or both switches will return the Ag102 to its normal charge mode 4 5 Status Output The Ag102 status output pin is connected to a PI...

Page 6: ...tput it will stop charging the battery and LED6 Over Current will illuminate This is considered to be a major fault condition that needs manual intervention Therefore the power to the evaluation board...

Page 7: ...Evaluation Board User Manual 6 5 Using the Board Figure 4 shows an example set up using the Ag102 to charge a 7Ah SLA battery For a 7Ah battery the J6 link is set to the R10 position Figure 4 Example...

Page 8: ...Ag102 Evaluation Board User Manual 7 6 EVALAg1x2 Evaluation Board Schematic Figure 5 EVALAg1x2 1R Schematic...

Page 9: ...Mouser Electronics Authorized Distributor Click to View Pricing Inventory Delivery Lifecycle Information Silvertel EvalAg102S...

Reviews: