Appendix 2 Leakage Current Measurement
────────────────────────────────────────────────────
Outlet
Insulating transformer
Red 9170
TEST LEAD
Black 9170 TEST LEAD
(not connected during
zero adjustment)
T2
T1
Equipment protective
earth terminal
Equipment
under test
N
Measurement network
3155
IEC 60950 (1991-10) + am4 (1996-07),
Measurement of earth leakage current on three-phase equipment
(2) Earth leakage current measurement (Three-phase equipment)
In this measurement, the auxiliary power socket is not used.
Connect the equipment to be measured to the power source via the table tap
and insulating transformer.
Connect the measurement network between the accessible conductive part or
accessible non-conductive part and the power line (neutral) with a pair of 9170
TEST LEADS, and measures the current that flows there.
Main settings of the 3155
Measuring mode: Enclosure leakage current
Contact condition: Between the enclosure and the power line
Summary of Contents for 3155-01
Page 1: ...LEAK CURRENT HiTESTER INSTRUCTION MANUAL 3155 01...
Page 2: ......
Page 12: ......
Page 27: ...7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 A Chapter 2 Names and Functions of Parts...
Page 45: ...25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 A Chapter 4 Preparations for Measurement...
Page 243: ...223 7 7 System Screen Universal Example of a data unit printout Example of a details printout...
Page 314: ...294...
Page 322: ...302 9 3 Accuracy Tables...
Page 334: ...314 10 6 External Dimensions 292 2 110 2 212 2 115 8 2 10 6 External Dimensions...
Page 335: ...315 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 APP Appendices...
Page 362: ...INDEX 6 Index...
Page 363: ......
Page 364: ......
Page 365: ......