![Hioki 3155-01 Instruction Manual Download Page 337](http://html1.mh-extra.com/html/hioki/3155-01/3155-01_instruction-manual_2137164337.webp)
317
────────────────────────────────────────────────────
Appendix 2 Leakage Current Measurement
────────────────────────────────────────────────────
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
APP
Appendix 2.1 IEC 60601-1 (1988-12) + am1 (1991-11) + am2
(1995-03)
2.1.1 Earth Leakage Current
Leakage current
Insulating
transformer
3155
Changeover box
A
Ammeter
Equipment to
be measured
Earth leakage current concept diagram
T2
T1
G
3-P outlet
Insulating
transformer
Leakage current
3155
Changeover box
Equipment to
be measured
Measurement network
Earth leakage current wiring diagram
NOTE
Appendix 2 Leakage Current Measurement
The term ’earth leakage current’ refers to leakage current that flows from the
protective earth terminal of the equipment to be measured (class
equipment) through the ground wire into the earth.
The 3155 connects a measurement network between the protective earth
conductor of the equipment to be measured and the earth, and measures the
current that flows there.
The changeover box in the diagram is a circuit that changes the power source
polarity and the condition of the equipment to be measured.
Summary of Contents for 3155-01
Page 1: ...LEAK CURRENT HiTESTER INSTRUCTION MANUAL 3155 01...
Page 2: ......
Page 12: ......
Page 27: ...7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 A Chapter 2 Names and Functions of Parts...
Page 45: ...25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 A Chapter 4 Preparations for Measurement...
Page 243: ...223 7 7 System Screen Universal Example of a data unit printout Example of a details printout...
Page 314: ...294...
Page 322: ...302 9 3 Accuracy Tables...
Page 334: ...314 10 6 External Dimensions 292 2 110 2 212 2 115 8 2 10 6 External Dimensions...
Page 335: ...315 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 APP Appendices...
Page 362: ...INDEX 6 Index...
Page 363: ......
Page 364: ......
Page 365: ......