January 2001
6 - 2
Preventive Maintenance
Service Manual Cafitesse 500
1. Heat sink
remove dust
X
2. Boiler
decalcify
3. Air filter and
filter cloth
clean
X
4. Air chute,
fan
X
5. PTFE shaft
sealing
replace
6. Product valves
decalcify
7. Auto-diaphragm
replace
X
8. Replace carber
9. Plexi glass cover clean
X
Item
Action
Interval (months)
Interval (others)
1
3
6
12
24
6
Preventive Maintenance
6.1 Preventive Maintenance Program for the Service
depending on the local
hardness of water
depending on the location
depending on the location
depending on the number
of dosings
depending on the local
hardness of water
–
depending on the local
hardness of water
monthly