January 2001
2 - 16
Installation / Putting into Operation
Service Manual Cafitesse 500
DAGMA
120/240
1,8 / max: 8,9
1,6 /max: 8,7
20 / max: 50
Min. dyn. line pres. 0,8 bar, Max.st. line pres. 10 bar
ATM
10
50/60
100001121185
CAFITESSE 500/A2
CFT014
VOLT
MADE IN GERMANY
TYP
NR.
TOTAL
HEIZUNG, HEATING
CHAUFFAGE
BETRIEBSDRUCK, OPERATING PRESSURE
PRESSION DE SERVICE
H
CHSTZUL. DRUCK, MAXIM. PRESSURE
PRESSION MAXIMUM
V~
kW
kW
A
W
A
l.
bar
HZ / CPS
KHLUNG, REFRIGERATION
REFROIDISSEMENT
COMPRESSOR, COMPRESSEUR
KESSELINHALT, BOILER CAP,
CAPACIT DE LA BUILLOIRE
bar
208/240
2,9/3,8
2,7/3,6
20
EINGESTELLTE
WERTE,
SELECTED
VALUES,
VALEURS
SLECTIONNES
U2
IPX1
LISTED
28G0
C
208/240
2.9/3.8
2.7/3.6
20
EINGESTELLTE
WERTE,
SELECTED
VALUES,
VALEURS
SÉLECTIONNÉES
U2=U3
208/240
4.4/5.8
4.2/5.6
30
EINGESTELLTE
WERTE,
SELECTED
VALUES,
VALEURS
SÉLECTIONNÉES
U1
208/240
2.4/3.1
2.2/2.9
20
EINGESTELLTE
WERTE,
SELECTED
VALUES,
VALEURS
SÉLECTIONNÉES
U4
120
1.8
1.6
20
EINGESTELLTE
WERTE,
SELECTED
VALUES,
VALEURS
SÉLECTIONNÉES
U6
208/240
6.8/8.9
6.6/8.7
50
EINGESTELLTE
WERTE,
SELECTED
VALUES,
VALEURS
SÉLECTIONNÉES
U5
Fig. 4
1
9
2
3
4
5
6
8
7
Rating plate CFT 014, CFT 500/AX, UL
0: without whipper
1: one whipper
2: two whippers
Overview sticker for the rating plate (Fig. 4)
●
Place correct sticker on rating plate (9)
●
The following power supply cables must be
used for the adjusted heating capacities:
Position 1–4 =>
power supply cable 3x10 AWG
Position 5
=>
power supply cable 3x6 AWG
Position 6
=>
power supply cables 3x14 AWG
Total load
=
Heating capacity + max. 200 W
CAUTION:
Under all circumstances
remove the rotary switch after
changing over the heating.
●
Remove the rotary switch (1). (Fig. 3)
●
Remount the small dummy cap.
●
Remove the correct sticker and put it in
place on the rating plate (9). (Fig. 4)