January 2001
5A - 20
Functions - Water System
Service Manual Cafitesse 500
●
Disconnect the dispenser from the mains
supply and close the water supply valve.
●
Remove the boiler cover. (see pg. 5.A-7)
●
Remove the front part.
●
Loosen the screw at the splash panel and
open the splash panel by pressing it
downwards.
●
Dismount the product valve (1). (Fig. 1)
●
Remove the inner pipe bend (2) in the
interior of the boiler (3) from the
corresponding solenoid valve. (Fig. 1)
●
Remove the valve clamp (4) from the
sealing (5). (Fig. 1)
●
Remove the sealing (5). (Fig. 1)
●
Assembly is done in the reverse order.
●
When mounting, place the valve clamp on
the sealing and insert the valve with the
inner pipe bent into the sealing until it
engages in the valve clamp.
●
Mount the new product valves with a new
nozzle (6) and the old nozzle holder (7).
Mount the new hot water valve. (Fig. 1)
A.2.10
Disassembly of the Sealing Bush Boiler/Product Valve
Fig. 1
2
3
5
4
6
7
1
Fig. 2
approx. 13mm
approx. 9mm
Outlet elbow for
hot water valve
Outlet elbow for
product valve
Outlet elbow for
hot water valve
Outlet elbow for
product valve