January 2001
5G - 4
Functions - Housing
Service Manual Cafitesse 500
co
ffe
e
co
ffe
e
ka
ffe
e
co
ff
ee
co
ff
ee
co
ff
ee
sto
p
BR
EW
ING
hot
wa
ter
●
Lift the front part (Fig. 5) and remove it.
Pull the cable carefully out.
●
The mounting is done in the reverse order.
●
When mounting the front part make sure
-
that the front part is hooked first at the
bottom and then at the top
-
that the locking angles (1) engage
properly (Fig. 5)
-
that the electrical connections are
correctly fastened to the dispenser
(boiler)
-
that the cooling compartment is correctly
installed underneath the housing cover.
-
that the outlet hose has been put
into the funnel of the motor housing
-
that the screws are fastened tightly to
the front part.
CAUTION:
In order to secure the sealing
between the outlet elbows and
the trough box, the position of
the outlet elbows (2) must be
corrected by pulling from
underneath after the
installation of the front part.
(Fig. 6)
Fig. 5
1
Fig. 6
2