
ESIE15-08B
|
Part 2. Troubleshooting
5. Component checklist - Refrigerant Circuit
19/07/16
Page 99
Daikin Altherma Monobloc CA
5.8. 4-way valve Y1R
1.
Switch off the Daikin Altherma Monobloc CA via the user interface.
2.
Switch off the Daikin Altherma Monobloc CA with the field supplied circuit breaker.
3.
Remove the hydrobox top plate assembly, refer to
"Removing the hydrobox top plate assembly" on page 110
4.
Remove the hydrobox front plate, refer to
"Removing the hydrobox front plate" on page 111
5.
Remove the top plate, refer to
"Removing the top plate" on page 112
.
6.
Remove the front plate assembly, refer to
"Removing the front plate assembly" on page 113
7.
Loosen the screw and remove the coil from the 4-way valve, refer to
"Replacing the 4-way valve coil" on page 127
8.
Unplug connector S80 from the PCB2 inverter board.
9.
Switch on the Daikin Altherma Monobloc CA via the user interface, start cooling operation on the user interface.
If the temperature after the plate type heat exchanger drops, proceed with step 10.
If the temperature after the plate type heat exchanger rises, the 4-way valve is stuck in heating position, replace the 4 way
valve, refer to
"Replacing the 4-way valve" on page 127
.
If the temperature after the plate type heat exchanger does not rise, check the refrigerant pressure by connecting a manifold
to one of the service ports.
- If no pressure is measured, perform a pressure test and fix the leaks.
- If pressure is measured, the 4-way valve is stuck in the middle, confirm by determining the position of the 4-way valve as
described below and replace the 4-way valve, refer to
"Replacing the 4-way valve" on page 127
Technical specification
Description
-
The 4-way valve directs the super heated refriger-
ant discharged from the compressor to the indoor
heat exchanger in case of heating operation or to
the outdoor heat exchanger in case of defrosting
and cooling operation.
Location
Piping diagram
PCB1
Unit
Check procedure
Mechanical check
C
AUTION
- R
ISK
OF
LIQUID
ENTERING
THE
COMPRESSOR
To prevent damage to the compressor the step below must only be done once.