
ESIE15-08B
|
Part 2. Troubleshooting
4. Component checklist - Water Circuit
19/07/16
Page 83
Daikin Altherma Monobloc CA
4.9. Water flow switch S1L
1.
Power the Daikin Altherma Monobloc CA.
2.
Activate “Installer level” on the user interface, refer to “Installer Level Settings” in the Installer Reference Guide to access the
most used commands.
3.
On the user interface, select Actuator test run A.7.4.
4.
On the user interface, activate the water pump (A.7.4.6).
5.
On the user interface, select Flow Rate 6.1.8.
6.
The displayed flow rate must be between 12 and 40 l/minute.
7.
Measure the voltage on X45A pin 1 -3. If 230 VAC is measured but no flow is displayed, replace the flow switch S1L.
If no 230 VAC is measured, remove connector X45A and measure again on PCB, if now 230 VAC is measured replace flow
switch, else replace hydro PCB A1P.
Technical specification
Description
Open/close contact, 230 VAC, setpoint 12.0 l/min.
The water flow switch opens when the flow < 12.0
l/min.
Location
Piping diagram
Switch box
Unit
Check procedure
Electrical check
W
ARNING
: R
ISK
OF
F
IRE
•
When reconnecting a connector to the PCB, do not apply force or damage the connector or the connector pins on
the PCB.
TR1
X5M
X4M
A2P
X3M
X7M
A1P
PCB3
X6Y
X45A
X45A