ESIE15-08B
|
Part 2. Troubleshooting
4. Component checklist - Water Circuit
19/07/16
Page 67
Daikin Altherma Monobloc CA
4.1.2. Resistance check
1.
Measure the backup heater resistance (tolerance = ±10%).
4.1.3. Isolation check
1.
Switch off the Daikin Altherma Monobloc CA via the user interface.
2.
Switch off the Daikin Altherma Monobloc CA with the field supplied circuit breaker.
3.
Open circuit breakers K1M & K2M, K5M (if installed).
4.
Set the Megger voltage to 500 VAC.
5.
Connect the Megger ground test lead directly to the backup heater ground wire (see red arrow below).
3 kW
6 kW
6 kW
9 kW
1~ 230 V
1~ 230 V
3N~ 400 V
3N~ 400 V
K1M/1
K5M/13
52.9
Ω
52.9
Ω
∞
∞
K1M/3
∞
∞
105.8
Ω
105.8
Ω
K1M/5
∞
∞
105.8
Ω
105.8
Ω
K1M/3
K1M/5
26.5
Ω
26.5
Ω
105.8
Ω
105.8
Ω
K2M/1
K5M/13
∞
26.5
Ω
∞
∞
K2M/3
∞
∞
52.9
Ω
52.9
Ω
K2M/5
∞
∞
52.9
Ω
52.9
Ω
K2M/3
K2M/5
52.9
Ω
52.9
Ω
52.9
Ω
52.9
Ω
K1M/5
K2M/1
∞
∞
∞
∞
C
AUTION
To prevent damage to the unit, F1B or F2B, K1M, K2M and K5M (if installed) must be OPENED before using a Meg-
ger.
C
AUTION
Do not connect the Megger ground test lead to a another grounding wire.