InteliLite Global Guide
49
After removing back cover insert the plug-in module. Plug-in module has to be inserted under holders. Start with
holders marked by symbol 1. On the controller are also arrows for better navigation. After inserting plug-in
module under holders 1 press it down to holders marked by symbol 2 which locks the module.
Insert the plug-in module under holders marked by symbol 1.
After locking the plug-in module into holders, place back the back cover (small cover for connectors has to be
removed from back cover). Finally insert the small cover for connectors. Small covers are unique for each plug-
in module.
Summary of Contents for InteliLite AMF25
Page 34: ...InteliLite Global Guide 34 ConnectionType SplPhL1L2 Image 4 11 Split phase L1L2 application ...
Page 36: ...InteliLite Global Guide 36 Image 4 14 Typical Split Phase generator wiring ...
Page 91: ...InteliLite Global Guide 91 Image 5 13 Flowchart of start of diesel engine ...
Page 93: ...InteliLite Global Guide 93 Image 5 14 Flowchart of start of gas engine ...
Page 721: ...InteliLite Global Guide 721 Image 9 34 IGS PTM Image 9 35 IGS PTM dimensions ...
Page 727: ...InteliLite Global Guide 727 Image 9 36 Inteli AIN8TC Image 9 37 Inteli AIN8TC dimensions ...
Page 731: ...InteliLite Global Guide 731 Image 9 38 Inteli AIO9 1 Image 9 39 Inteli AIO9 1 dimensions ...