Image 5.21 Breaker fail - breaker close/open opens
When binary output breaker close/open closes there is 2 sec delay for breaker fail detection.
Image 5.22 Breaker fail - breaker close/open closes
5.5.12 Exercise timers
The exercise (general-purpose) timers in controller are intended for scheduling of any operations such as e.g.
periodic tests of the gen-set, scheduled transfer of the load to the gen-set prior to an expected disconnection of
the mains etc.
Related setpoints for timer 1 are:
Timer 1 First Occur. Date (page 305)
Timer 1 First Occur. Time (page 305)
Timer 1 Repeated Day In Week (page 309)
Timer 1 Repeat Day In Month (page 309)
Timer 1 Repeat Week In Month (page 310)
Summary of Contents for InteliLite AMF25
Page 34: ...InteliLite Global Guide 34 ConnectionType SplPhL1L2 Image 4 11 Split phase L1L2 application ...
Page 36: ...InteliLite Global Guide 36 Image 4 14 Typical Split Phase generator wiring ...
Page 91: ...InteliLite Global Guide 91 Image 5 13 Flowchart of start of diesel engine ...
Page 93: ...InteliLite Global Guide 93 Image 5 14 Flowchart of start of gas engine ...
Page 721: ...InteliLite Global Guide 721 Image 9 34 IGS PTM Image 9 35 IGS PTM dimensions ...
Page 727: ...InteliLite Global Guide 727 Image 9 36 Inteli AIN8TC Image 9 37 Inteli AIN8TC dimensions ...
Page 731: ...InteliLite Global Guide 731 Image 9 38 Inteli AIO9 1 Image 9 39 Inteli AIO9 1 dimensions ...