Packing and Shipping the Library
Installation and Operation
97
8.
Replace the air filter grilles on each side of the front panel.
9.
Press the spring clips on the rails and push the rails back into the rack.
Inserting the packing foam in the library
1.
Insert the packing foam next to the CHM, as shown in
Figure 7-4
.
Figure 7-3
Lifting the library from the rack
Summary of Contents for Scalar AIT 440
Page 1: ...INSTALLATION AND OPERATING GUIDE SCALAR AIT 440 480...
Page 2: ...Scalar AIT 440 480 Libraries Installation and Operation...
Page 7: ...vi Scalar AIT 440 480 Notes...
Page 11: ...x Scalar AIT 440 480 Notes...
Page 25: ...xxiv Scalar AIT 440 480 Notes...
Page 101: ...Operating the Tape Drives Installation and Operation 77 Notes...
Page 135: ...Chapter 8 112 Scalar AIT 440 480 Notes...
Page 153: ...Chapter 9 130 Scalar AIT 440 480 Notes...
Page 179: ...Chapter 11 156 Scalar AIT 440 480 Notes...
Page 185: ...Appendix A 162 Scalar AIT 440 480 Notes...