Grounding:
■
The machine and power distributor system must be equipped
with a grounding line in accordance with NEC article 150,
"Grounding".
■
For details on grounding power distributor systems and
industrial plants, refer to the NEC standards or consult an
electrician or the power station.
IT network
A surge diverter is required if the machine is connected to an IT
network.
TRUMPF recommends surge diverters from the following manu-
facturers:
■
Phoenix Contact GmbH & Co. KG, Flachsmarktstraße 8,
D-32825 Blomberg, E-mail: [email protected].
■
Dehn+Söhne, PO Box No. 1640, D-92306 Neumarkt, E-mail:
[email protected].
4.3
Network link
TRUMPF provides the following interfaces for the network (e.g.
connection to a programming system) in the switch cabinet of
the machine:
■
RJ 45 plugs for customers with shielded-twisted pair network
cabling.
B579EN
Electrics - Version 10
2
‐
17
Содержание BendMaster 150
Страница 1: ...Operator s manual BendMaster TruBend Cell 5000...
Страница 2: ......
Страница 3: ...Operator s manual BendMaster TruBend Cell 5000 Original operator s manual Edition 2015 06 01...
Страница 6: ...II Before you proceed 2015 06 01 B579EN...
Страница 16: ...0 10 Table of contents 2015 06 01 B579EN...
Страница 44: ...1 28 Disassembly and disposal 2015 06 01 B579EN...
Страница 251: ...Chapter 6 Maintenance Technical Service 1 Maintenance overview 6 2 B579EN 2015 06 01 Maintenance Technical Service 6 1...