6. Press .
The selected element is opened and displayed in the window
on the left.
7. In the window on the right, mark the desired production
packages or jobs.
Fig. 59281
8. Press
<
. The marked element is added to the production
plan on the left.
Tip
The
Update
button can be used to update the list of availa-
ble jobs.
9. Press
Save
to save the production plan.
10. Highlight the desired element in the window on the left.
11. Press
>
. The marked element is removed from the produc-
tion plan on the left.
12. Highlight the element to be modified in the production plan.
13. Press
⇑
to move the element up.
or
Ø
Press
⇓
to move the element down.
14. Highlight the desired element in the window on the right.
15. Press
. The marked element is removed from the pro-
duction plan on the left.
Setting the speed and required number
1. Open "Jobs", "Packages" or "Production lists" in the window
on the right.
B579EN
2015-06-01
Running in a TruTops program
4
‐
103
Adding elements to the
production plan
Remove elements from the
production plan
Modifying the sequence of
the elements
Deleting an element
completely
Содержание BendMaster 150
Страница 1: ...Operator s manual BendMaster TruBend Cell 5000...
Страница 2: ......
Страница 3: ...Operator s manual BendMaster TruBend Cell 5000 Original operator s manual Edition 2015 06 01...
Страница 6: ...II Before you proceed 2015 06 01 B579EN...
Страница 16: ...0 10 Table of contents 2015 06 01 B579EN...
Страница 44: ...1 28 Disassembly and disposal 2015 06 01 B579EN...
Страница 251: ...Chapter 6 Maintenance Technical Service 1 Maintenance overview 6 2 B579EN 2015 06 01 Maintenance Technical Service 6 1...