Name
Description
Job
Name of the job in which the stack was created.
Range
Specifies whether the stack is a loading or unload-
ing stack.
Stack use
■
Stacked
= the blanks are picked up as program-
med in TruTops.
■
Box
= the finished parts are placed in a box.
Number of layers
Number of layers of the stack.
Current number of
sheets
Number of finished parts in the unloading stack.
Can be changed by a piece with
Sheet
,
Increment
Sheet
or
Sheet
,
Decrement Sheet
.
Quantity intermedi-
ate layers
Number of intermediate layers in the unloading
stack.
Max. sheets
Maximum number of finished parts which can be
deposited on the unloading stack until
A stack full
is established. The maximum number of finished
parts comes from TruTops and depends on the
simulated unloading stack. It can only be reduced,
not increased.
Details on the loading stack
Tab. 4-21
14. Press
Display
,
Overview
to display the graphic again.
The stack processing sequence can be adjusted both for loading
and unloading stacks, e.g. when using eccentric grippers. This is
only possible with a loaded job:
Fig. 51855
15. Mark the desired stack under "Loading stack" or "Unloading
stack".
16. Move the marked stack up using ↑ or down using ↓.
The stack at the first position is executed first, the stack at
the second position is executed second, and so on.
B579EN
2015-06-01
Running in a TruTops program
4
‐
83
Redisplaying the diagram
Defining the stack
processing sequence
Содержание BendMaster 150
Страница 1: ...Operator s manual BendMaster TruBend Cell 5000...
Страница 2: ......
Страница 3: ...Operator s manual BendMaster TruBend Cell 5000 Original operator s manual Edition 2015 06 01...
Страница 6: ...II Before you proceed 2015 06 01 B579EN...
Страница 16: ...0 10 Table of contents 2015 06 01 B579EN...
Страница 44: ...1 28 Disassembly and disposal 2015 06 01 B579EN...
Страница 251: ...Chapter 6 Maintenance Technical Service 1 Maintenance overview 6 2 B579EN 2015 06 01 Maintenance Technical Service 6 1...