2.
Installation site
Please consult a structural analyst for professional support, par-
ticularly in the context of the topic of floor requirements. Hand
over the "Installation site" section and the installation plan to the
structural analyst.
2.1
Space requirements
The following is documented in the TRUMPF installation:
■
Arrangement of components.
■
Space requirements for installation.
■
Space requirements of the system.
■
Space requirements for opening all doors.
■
Electric power supply.
■
Compressed air supply.
■
TruBend Cell 5000 with BendMaster (60): at least 4000 mm
(at least 157 in).
■
TruBend Cell 5000 with BendMaster (150): at least 5000 mm
(at least 197 in).
2.2
Floor requirements
The quality of the prepared parts can be guaranteed only when
the floor conditions meet TRUMPF requirements.
Surface
The floor on which the machine stands must be even.
Permissible deviation from flatness (flatness tolerance):
■
Footprint range: max. 12 mm (½ in) per 10 m (33 ft).
■
Load-bearing points range: max. 2 mm (0.08 in) per 0.5 m
(1.64 ft).
The flatness tolerance can be determined for different measuring
point distances from the following diagram.
2
‐
6
Installation site - Version 10
B579EN
What does the customer
need to do?
Hall height
Flatness
Содержание BendMaster 150
Страница 1: ...Operator s manual BendMaster TruBend Cell 5000...
Страница 2: ......
Страница 3: ...Operator s manual BendMaster TruBend Cell 5000 Original operator s manual Edition 2015 06 01...
Страница 6: ...II Before you proceed 2015 06 01 B579EN...
Страница 16: ...0 10 Table of contents 2015 06 01 B579EN...
Страница 44: ...1 28 Disassembly and disposal 2015 06 01 B579EN...
Страница 251: ...Chapter 6 Maintenance Technical Service 1 Maintenance overview 6 2 B579EN 2015 06 01 Maintenance Technical Service 6 1...