2
Maintaining the DSQ II
Preparing the DSQ II for Maintenance
26
DSQ II Hardware Manual
Thermo Scientific
2. Shut down and vent the DSQ II, as described in
"Shutting Down the GC/MS System"
.
3. Remove the front cover.
4. Loosen the fastener located on the front of the DSQ II that attaches the top cover to the
chassis.
Figure 11.
Removing the Top Cover Fastener
5. Slide the top cover forward about 2.5 cm (1-inch).
6. Lift the top cover up and away from the DSQ II.
7. Reverse these steps to reinstall the top cover.
WARNING - ELECTRICAL SHOCK HAZARD.
Before proceeding. unplug the DSQ II to
avoid an electrical shock
Top Cover Fastener
Содержание DSQ II
Страница 1: ...DSQ II Hardware Manual 120299 0002 Revision C December 1 2009 ...
Страница 4: ......
Страница 8: ......
Страница 36: ...1 Basic Operations Shutting Down the GC MS System 20 DSQ II Hardware Manual Thermo Scientific ...
Страница 182: ...4 Vacuum System and Gas Inlets Gas Inlet Components 166 DSQ II Hardware Manual Thermo Scientific ...
Страница 198: ...5 Ion Source and Inlet Valve Inlet Valve Upgrade 182 DSQ II Hardware Manual Thermo Scientific ...
Страница 202: ...6 Prefilter and Quadrupole 186 DSQ II Hardware Manual Thermo Scientific ...
Страница 206: ...7 Ion Detector Electron Multiplier 190 DSQ II Hardware Manual Thermo Scientific ...
Страница 242: ...226 DSQ II Hardware Manual Thermo Scientific Index ...