1
Basic Operations
Shutting Down the GC/MS System
Thermo Scientific
DSQ II Hardware Manual
19
b. Switch the main circuit breaker to OFF (0), which turns off the rotary-vane pump.
Approximately three seconds later, the vent valve opens and the vacuum manifold
vents to atmospheric pressure. This takes approximately three to four minutes.
c.
Remove the DSQ II power cord from the wall socket.
4. Wait for the TRACE GC Ultra oven, injector, and transfer line to cool to room
temperature.
5. Power off all the remaining instruments.
a.
Power off the TRACE GC Ultra by switching the main circuit breaker to OFF (0).
b. Turn off the GC’s helium supply at the tank.
c.
Power off the autosampler (optional) by switching the main power switch to OFF.
IMPORTANT
The process ends here if you are planning to perform system maintenance
on the DSQ II alone (for example, to clean the ion source). You don’t need to turn off the
TRACE GC Ultra, data system, and autosampler.
Содержание DSQ II
Страница 1: ...DSQ II Hardware Manual 120299 0002 Revision C December 1 2009 ...
Страница 4: ......
Страница 8: ......
Страница 36: ...1 Basic Operations Shutting Down the GC MS System 20 DSQ II Hardware Manual Thermo Scientific ...
Страница 182: ...4 Vacuum System and Gas Inlets Gas Inlet Components 166 DSQ II Hardware Manual Thermo Scientific ...
Страница 198: ...5 Ion Source and Inlet Valve Inlet Valve Upgrade 182 DSQ II Hardware Manual Thermo Scientific ...
Страница 202: ...6 Prefilter and Quadrupole 186 DSQ II Hardware Manual Thermo Scientific ...
Страница 206: ...7 Ion Detector Electron Multiplier 190 DSQ II Hardware Manual Thermo Scientific ...
Страница 242: ...226 DSQ II Hardware Manual Thermo Scientific Index ...