2
Maintaining the DSQ II
Maintaining Components Outside the Vacuum Manifold
90
DSQ II Hardware Manual
Thermo Scientific
d. Remove the electrometer board cover.
Figure 50.
Electrometer Board with Cover Removed
e.
Remove the screw holding the wire to anode feedthrough.
f.
Remove the nut holding the electrometer board to anode feedthrough.
g. Remove the screw holding the electrometer board to vacuum manifold and pull out
the electrometer board.
5. Install the new electrometer board (PN 119590-0500).
a.
Insert the new electrometer board.
b. Reattach the screws and nuts.
c.
Reattach the electrometer board cover.
d. Reattach the screws to the cover.
e.
Reattach the cal gas vial.
f.
Reconnect the cable.
6. Reattach the left, top, and front covers of the DSQ II.
7. Restart the DSQ II.
1
Electrometer Board
(PN 119590-0500)
4
Anode Feedthrough
2
Nut Holding Electrometer Board
to Anode Feedthrough
5
Screw Holding Electrometer
Board to Vacuum Manifold
3
Screw Holding Wire to Anode
Feedthrough
6
Vacuum Manifold
1
2 3
4
5
6
Содержание DSQ II
Страница 1: ...DSQ II Hardware Manual 120299 0002 Revision C December 1 2009 ...
Страница 4: ......
Страница 8: ......
Страница 36: ...1 Basic Operations Shutting Down the GC MS System 20 DSQ II Hardware Manual Thermo Scientific ...
Страница 182: ...4 Vacuum System and Gas Inlets Gas Inlet Components 166 DSQ II Hardware Manual Thermo Scientific ...
Страница 198: ...5 Ion Source and Inlet Valve Inlet Valve Upgrade 182 DSQ II Hardware Manual Thermo Scientific ...
Страница 202: ...6 Prefilter and Quadrupole 186 DSQ II Hardware Manual Thermo Scientific ...
Страница 206: ...7 Ion Detector Electron Multiplier 190 DSQ II Hardware Manual Thermo Scientific ...
Страница 242: ...226 DSQ II Hardware Manual Thermo Scientific Index ...