Thermo Scientific
DSQ II Hardware Manual
21
2
Maintaining the DSQ II
This chapter describes how to perform maintenance on every component in the DSQ II.
Keeping your DSQ II in good working condition increases laboratory productivity and helps
you get the most out of the instrument.
Contents
• "
Components That Require Maintenance" on page 22
• "
• "
Recommended Maintenance Schedule" on page 23
• "
Running Benchmark Tests" on page 24
• "Preparing the DSQ II for Maintenance" on page 25
• "Cleaning the Ion Source Components" on page 38
• "Replacing the Electron Multiplier" on page 59
• "Maintaining the Turbomolecular Pump" on page 62
• "Maintaining the Rotary-Vane Pump" on page 62
•
"Maintaining Components Outside the Vacuum Manifold" on page 70
Содержание DSQ II
Страница 1: ...DSQ II Hardware Manual 120299 0002 Revision C December 1 2009 ...
Страница 4: ......
Страница 8: ......
Страница 36: ...1 Basic Operations Shutting Down the GC MS System 20 DSQ II Hardware Manual Thermo Scientific ...
Страница 182: ...4 Vacuum System and Gas Inlets Gas Inlet Components 166 DSQ II Hardware Manual Thermo Scientific ...
Страница 198: ...5 Ion Source and Inlet Valve Inlet Valve Upgrade 182 DSQ II Hardware Manual Thermo Scientific ...
Страница 202: ...6 Prefilter and Quadrupole 186 DSQ II Hardware Manual Thermo Scientific ...
Страница 206: ...7 Ion Detector Electron Multiplier 190 DSQ II Hardware Manual Thermo Scientific ...
Страница 242: ...226 DSQ II Hardware Manual Thermo Scientific Index ...