2
Maintaining the DSQ II
Maintaining Components Outside the Vacuum Manifold
Thermo Scientific
DSQ II Hardware Manual
77
7. Add 200 μL of calibration compound. See "
Refilling the Calibration Gas Flow Module"
for more information.
8. Test the gas fittings for leaks.
a.
Use the DSQ II to check each fitting for leaks, as described in "
b. Correct leaks by tightening or replacing the connections. Continue to check and
correct leaks until all connections are leak-free.
9. Turn on the CI reagent gas supply (if present).
10. Reattach the right, left, top, and front covers of the DSQ II.
11. Restart the DSQ II.
12. Once the DSQ II has pumped down and is operational, check for vacuum leaks by
reading the convectron gauge and ion gauge and running an automatic tune.
Refilling the Calibration Gas Flow Module
Calibration compound is a liquid whose mass spectrum is used to tune and calibrate the
DSQ II. The DSQ II uses FC-43 as its calibration compound. You cannot tell by sight
whether calibration compound needs to be added. However, during an
Xcalibur
automatic
tune, an error message displays “the intensity of calibration gas ions is too low.”
There are many factors that can cause a shortage of calibration gas ions besides a decrease in
calibration compound. As a rule, the DSQ II should never require adding calibration
compound more than once a year.
To refill the calibration gas flow module, you will need:
• FC-43 calibration compound (PN 50010-30059)
• Screwdriver, Phillips #2
• Syringe
• Wrench, open-ended, 9/16-in.
1. Cover the work area with a lint-free cloth.
2. Shut down and vent the DSQ II, as described in
"Shutting Down the GC/MS System"
.
CAUTION - INSTRUMENT DAMAGE.
Do not use liquid soap leak detectors (such as
Snoop) to check for leaks. They will contaminate your system.
WARNING - ELECTRICAL SHOCK HAZARD.
Before proceeding. unplug the DSQ II to
avoid an electrical shock.
Содержание DSQ II
Страница 1: ...DSQ II Hardware Manual 120299 0002 Revision C December 1 2009 ...
Страница 4: ......
Страница 8: ......
Страница 36: ...1 Basic Operations Shutting Down the GC MS System 20 DSQ II Hardware Manual Thermo Scientific ...
Страница 182: ...4 Vacuum System and Gas Inlets Gas Inlet Components 166 DSQ II Hardware Manual Thermo Scientific ...
Страница 198: ...5 Ion Source and Inlet Valve Inlet Valve Upgrade 182 DSQ II Hardware Manual Thermo Scientific ...
Страница 202: ...6 Prefilter and Quadrupole 186 DSQ II Hardware Manual Thermo Scientific ...
Страница 206: ...7 Ion Detector Electron Multiplier 190 DSQ II Hardware Manual Thermo Scientific ...
Страница 242: ...226 DSQ II Hardware Manual Thermo Scientific Index ...