
84/226
Building Technologies
Boiler Sequence Controller RMK770
CE1P3132en
HVAC Products
6 Boiler sequence management
01.03.2005
Output stage
1 2
3 4
5
Boiler release
1.1 1.1+1.2 2.1 2.1+2.2 1.1+2.1+2.2
This switch-on order is called binary switching on. With the RMK770, binary switching
on is restricted to the first 2 boilers. The next boilers are switched sequentially. With
binary switching on, boiler 2 is always the controlling boiler.
Binary switching of boiler sequence with 2 boilers:
Output of boiler 1 = 100 %, output of boiler 2 = 200 %
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
3132D
03
Heat demand or load
Bo
il
e
r 1
Boil
e
r 2
Main menu > Commissioning > Settings > …
or
Main menu > Settings > Boiler sequence manager > Control parameters
Operating line
Range
Factory setting
Boiler sequence strategy
Sequentially / Binary-
sequentially
Sequentially
6.3.4
Boiler sequence operating mode
or
Main menu > Boiler sequence manager > Boiler sequence optg mode
Operating line
Range
Factory setting
Preselection
Auto / Release DHW / Off
Auto
Setp preselection manual
---- / 8…140 °C
---- °C
Main flow temperature actual
value
State
On / Off
Cause Commissioning
/
Operating mode selector /
Frost protection for consumer /
Flow/return frost protection /
Sustained mode /
Overtemp protection / overrun /
Protective boiler startup seq /
Flue gas measuring mode /
Manual control /
No boiler sensor available /
No requisition / Requisition
Boil sequence selection manual Auto / 1…6
Auto
Selection of the boiler sequence operating mode includes “Auto“, “Release DHW“ and
“Off“.
Example