80/226
Building Technologies
Boiler Sequence Controller RMK770
CE1P3132en
HVAC Products
6 Boiler sequence management
01.03.2005
with 3 binary inputs between Auto – 1 – 2 – 3 – 4 – 5 – 6.
The selector must be appropriately wired.
D2
D1
GE
1
3
2
4
5
6
7
1
3
2
4
5
6
7
1
3
2
4
5
6
7
D3
Auto 1
3
2
4
5
6
31
32Z
10
D1
D2
D3
Position 1
Auto
0
0
0
Position 2
Boiler 1
1
0
0
Position 3
Boiler 2
0
1
0
Position 4
Boiler 3
1
1
0
Position 5
Boiler 4
0
0
1
Position 6
Boiler 5
1
0
1
Position 7
Boiler 6
0
1
1
In Auto position, the lead boiler and the associated boiler sequence can do an auto-
matic changeover depending on the burner hours run of the lead boiler.
The burner hours run are calculated by the boiler sequence manager and are inde-
pendent of the hours run counters of the individual boilers.
Automatic boiler changeover ensures that the number of burner operating hours of the
individual boilers are pretty much the same.
Main menu > Commissioning > Settings > …
or
Main menu > Settings >
Boiler sequence manager > Control parameters
Operating line
Range
Factory setting
Changeover interval
----, 1…1440 h
500 h
Changeover day
--- / Monday…Sunday
Tuesday
Changeover time
00:00…23:59
04:00
Automatic boiler change-
over
Note
Setting