75
LA
LZR
LZ
LBR
LB
LAR
SD
OP
LG
Encoder A dIfferential phase
Encoder Z differential phase
Encoder B dIfferential phase
Z phase open-collector signal
RS-485-A
RS-485-B
GND
CN3
R
L1
L2
T
S
MC
MCCB
There-phase
AC200V~240V
(Note 5)
伺服驅動器
LSP
DI7
DI6
DI5
DI4
DI3
DI2
DI1
LSN
DI8
CN1
CN4
less than 10m
CN1
22
20
19
18
17
16
15
14
23
21
40
34
39
38
37
36
35
VDD
COM+
48
49
Note1: if external power supply is applied, do not connect VDD and COM+
Note2: please refer to user manual for description of regenerative resistor and brake control unit.
Note3: please refer to user manual for digital output DO sink type or source type wiring.
Note4: if HEIDENHAIN absolute communication protocol is applied, you should connect servo to all CN2 Pin6-9.
Note5: there is no L1,L2 for 440V system, please connect external DC24V power to the front panel +/- sign position.
CN1
VCC
TLA
LG
1
、
26
27
3
、
4
、
28
、
31
2.5K
Ω
5K
Ω
SG
24
、
25
、
50
USB
servo
communication
software
+
DI11
12
DI12
13
POS4
POS5
RES
POS2
POS1
SON
CTRG
CR
EMG
LSP
LSN
POS3
(Note 1)
VDD
DO2
DO1
DO5
DO4
DO3
RA1
RA1
RA3
RA2
RA5
RA4
CN1
48
42
41
45
44
43
RA6
DO6
46
INP
CMDOK
ZSP
RD
TLC
ALM
DOCOM
47
SG
24
、
25
、
50
P
PE
D
W
V
U
C
regenerative
resistor(note2)
伺服馬達
Encoder
SD
less than 50m
CN2
VCC
5V
1
、
3
7
6
5
2
、
4
GND
VCC
3.6V
ENCP
ENCN
N
digital output
common terminal
(note3)
SD
3
、
4
、
28
、
31
8
9
CLKP
CLKN
(Note 4)
1
2
3
、
4
CN6
STO
CN1
CN1
MON1
LG
MON2
SD
29
30
Output voltage ±10V
3
、
4
、
28
、
31
Servo Drive
Servo motor
Output voltage ±10V
Содержание SDP Series
Страница 33: ...20 400V series DC 24V Power supply Note terminal P N cannot be grounded ...
Страница 42: ...29 2 CN1 connector male Front view Side view Rear view CN1 wiring terminal on the back of CN1 1 26 50 25 ...
Страница 45: ...32 4 The last step is to fasten the screw of housing ...
Страница 203: ...190 It is recommended that the user performs torque position mode switching after motor is stopped completely ...
Страница 385: ...372 ...
Страница 405: ...392 ...
Страница 499: ...486 SME L040 SME L075 SME L100 SME L150 ...
Страница 500: ...487 SME L200 SME L300 SME M100 SME M150 ...
Страница 509: ...496 When the load reaches 300 the operation time is 5 51 seconds ...
Страница 541: ...528 Middle inertia power cable Middle inertia 2KW 3KW 400V High inertia power cable 1 8KW 2 9KW 4 4KW 5 5KW 7 5KW ...
Страница 555: ...542 14 5 Manual version and revision history Manual version V1 00 Release month July 2022 ...