236
(4)
Input/output setting parameters
NO
Abbreviation
Name
Default
value
Unit
Control
mode
Pt Pr S T
PD01(*) DIA1
Input signal automatic ON
option 1
0000h
N/A ○ ○ ○ ○
PD02(*) DI1
Input signal option 1
0001h
N/A ○ ○ ○ ○
PD03(*) DI2
Input signal option 2
000Dh
N/A ○ ○ ○ ○
PD04(*) DI3
Input signal option 3
0003h
N/A ○ ○ ○ ○
PD05(*) DI4
Input signal option 4
0004h
N/A ○ ○ ○ ○
PD06(*) DI5
Input signal option 5
0002h
N/A ○ ○ ○ ○
PD07(*) DI6
Input signal option 6
000Fh
N/A ○ ○ ○ ○
PD08(*) DI7
Input signal option 7
0012h
N/A ○ ○ ○ ○
PD09(*) DI8
Input signal option 8
0011h
N/A ○ ○ ○ ○
PD10(*) DO1
Output signal option 1
0003h
N/A ○ ○ ○ ○
PD11(*) DO2
Output signal option 2
0008h
N/A ○ ○ ○ ○
PD12(*) DO3
Output signal option 3
0007h
N/A ○ ○ ○ ○
PD13(*) DO4
Output signal option 4
0005h
N/A ○ ○ ○ ○
PD14(*) DO5
Output signal option 5
0001h
N/A ○ ○ ○ ○
PD15(*) DIF
Digital input filter setting
0002h
N/A ○ ○ ○ ○
PD16(■) IOS
Digital input source control
option
0000h
N/A ○ ○ ○ ○
PD17(*) DOP1
LSP, LSN stop mode option
0000h
N/A ○ ○ ○
PD18(*) DOP2
CR signal clear setting
0000h
N/A ○ ○
PD19(*) DOP3
Alarm code output option
0000h
N/A ○ ○ ○ ○
PD20(*) DOP4
Operation option when the
alarm reset signal is short-
circuited
0000h
N/A ○ ○ ○ ○
PD21(*) DI9
Input signal option 9
0018h
N/A ○ ○ ○ ○
PD22(*) DI10
Input signal option 10
0019h
N/A ○ ○ ○ ○
PD23(*) DI11
Input signal option11
0005h
N/A ○ ○ ○ ○
PD24(*) DI12
Input signal option 12
0010h
N/A ○ ○ ○ ○
PD25(■) ITST
Communication control DI
contact status
0000h
N/A ○ ○ ○ ○
PD26(*) DO6
Output signal option 6
0002h
N/A ○ ○ ○ ○
PD27(*) DOD
Definition of output signal
contact
0020h
N/A ○ ○ ○ ○
Содержание SDP Series
Страница 33: ...20 400V series DC 24V Power supply Note terminal P N cannot be grounded ...
Страница 42: ...29 2 CN1 connector male Front view Side view Rear view CN1 wiring terminal on the back of CN1 1 26 50 25 ...
Страница 45: ...32 4 The last step is to fasten the screw of housing ...
Страница 203: ...190 It is recommended that the user performs torque position mode switching after motor is stopped completely ...
Страница 385: ...372 ...
Страница 405: ...392 ...
Страница 499: ...486 SME L040 SME L075 SME L100 SME L150 ...
Страница 500: ...487 SME L200 SME L300 SME M100 SME M150 ...
Страница 509: ...496 When the load reaches 300 the operation time is 5 51 seconds ...
Страница 541: ...528 Middle inertia power cable Middle inertia 2KW 3KW 400V High inertia power cable 1 8KW 2 9KW 4 4KW 5 5KW 7 5KW ...
Страница 555: ...542 14 5 Manual version and revision history Manual version V1 00 Release month July 2022 ...