212
SOUR:
it is used to set the data source. There are two options: constant or parameter value.
SOUR option
Description
Bit 27
Bit 26
(SOUR)
Bit 25 Bit 24 Data source Write destination
x
0
x
x
Constant
P□XX
x
1
x
x
P□XX
P□XX
□: parameter group(A~F) XX: parameter number
Source:
it has different definition according to SOUR setting as shown in the following table
Source
31~28 27~24 23~20 19~16 15~12 11~8
7~4 3~0 bit
SOUR =0
Constant
SOUR =1 Rsvd (0x00000)
P_Grp P_idx
P_Grp, P_idx: the specified writing parameter group and number.
Constant: constant data to be written.
If the written value exceeds the parameter value range, AL.63 will be displayed. If P_Grp is
out of range, AL.61 will be displayed. If P_Idx is out of range, AL.62 will be displayed. If some
parameters cannot be written in when SON is ON, AL.64 will be displayed and the following
PR command will stop automatically.
Index positioning(Indexing): when TYPE=A, it can be applied in turret application.
(Take PATH#01 for example)
31~28 27~24 23~20 19~16 15~12 11~8 7~4 3~0 BIT
PE03
x
OPT2
DLY
SPD
DEC ACC OPT
A
PE04 DATA (0~4194304): index coordinate command, unit:pulse
The definition of OPT is as follows:
OPT option
Bit 7
(0/8)
Bit 6
(0/4)
Bit 5
(0/2)
Bit 4
(0/1)
00: always forward (CCW)
01: always reverse(CW)
10:shortest path.
(Judging by current position and target position)
OVLP
(overlap)
INS
(interrupt)
INS:
if set as INS, it means the current PR will interrupt the previous PR.
Содержание SDP Series
Страница 33: ...20 400V series DC 24V Power supply Note terminal P N cannot be grounded ...
Страница 42: ...29 2 CN1 connector male Front view Side view Rear view CN1 wiring terminal on the back of CN1 1 26 50 25 ...
Страница 45: ...32 4 The last step is to fasten the screw of housing ...
Страница 203: ...190 It is recommended that the user performs torque position mode switching after motor is stopped completely ...
Страница 385: ...372 ...
Страница 405: ...392 ...
Страница 499: ...486 SME L040 SME L075 SME L100 SME L150 ...
Страница 500: ...487 SME L200 SME L300 SME M100 SME M150 ...
Страница 509: ...496 When the load reaches 300 the operation time is 5 51 seconds ...
Страница 541: ...528 Middle inertia power cable Middle inertia 2KW 3KW 400V High inertia power cable 1 8KW 2 9KW 4 4KW 5 5KW 7 5KW ...
Страница 555: ...542 14 5 Manual version and revision history Manual version V1 00 Release month July 2022 ...