451
AL.58 Excessive position deviation after initial magnetic field detection
Alarm cause
Checking method
Corrective action
During initial magnetic field
detection, it will check if the
position deviation is within the
range. If not, AL.58 occurs.
1. check if the command is
issued right after the
power is applied
2. check if the move
distance is too far during
initial magnetic detection
1.Do not input the
command right after
apply power to the
servo.
2.Decrease
PL12(the magnetic
detection current).
AL.1A Undefined index coordinate
Alarm cause
Checking method
Corrective action
When using the indexing function,
you need to execute homing to
define the starting point of the
indexing coordinates. otherwise,
an alarm will occur.
Check whether homing
has been executed.
1. Before operating
the indexing
function, make sure
execute homing first
to avoid this alarm.
2. Use DI:Alm reset
function to clear the
alarm when alarm
occurs.
3. This alarm can
also be cleared
when Servo is ON.
AL.1B Position shift warning
Alarm cause
Checking method
Corrective action
When DO: MC_OK is already on,
and then MC_OK signal turns off.
Please refer to PD28 description.
When DO:MC_OK is
already on, it may turn off
when DO:INP turns off,
The external force after
motor completed
positioning may cause
the position shift.
1. Turn on RES
signal.
2. Press Set button at
alarm display screen.
3. Restart the power.
4. Restart SON
signal
Содержание SDP Series
Страница 33: ...20 400V series DC 24V Power supply Note terminal P N cannot be grounded ...
Страница 42: ...29 2 CN1 connector male Front view Side view Rear view CN1 wiring terminal on the back of CN1 1 26 50 25 ...
Страница 45: ...32 4 The last step is to fasten the screw of housing ...
Страница 203: ...190 It is recommended that the user performs torque position mode switching after motor is stopped completely ...
Страница 385: ...372 ...
Страница 405: ...392 ...
Страница 499: ...486 SME L040 SME L075 SME L100 SME L150 ...
Страница 500: ...487 SME L200 SME L300 SME M100 SME M150 ...
Страница 509: ...496 When the load reaches 300 the operation time is 5 51 seconds ...
Страница 541: ...528 Middle inertia power cable Middle inertia 2KW 3KW 400V High inertia power cable 1 8KW 2 9KW 4 4KW 5 5KW 7 5KW ...
Страница 555: ...542 14 5 Manual version and revision history Manual version V1 00 Release month July 2022 ...