313
PC60 ECMN E-Cam: segment number (N):
Indicates that the E-Cam curve is divided into N
segments, and the table includes N+1 data.
N (PC92 - PC59)
PC60 × PC62 2
31
-1
Note: this parameter is only writable when E-Cam
stops (PC66x=0).
Pr
5
5
~
720
N/A
PC61 ECMM E-Cam: cycle number (M):
When source axis receives the pulse number P
from the master axis, E-Cam rotates the M cycles
defined by PC61.
PC60 × PC61 PC62
PC60 × PC62 2
31
-1
Note: this parameter is only writable when E-Cam
stops (PC66x.Bit0=0).
Pr
1
1
~
32767
N/A
PC62 ECMP
E-Cam: master axis pulse number (P):
Please refer to PC61.
Note: this parameter can be modified at any time.
But drastic modification may cause sudden
unintended acceleration.
Pr
3600
10
~
2
30
-1
N/A
PC63
ECME E-Cam: engaged segment number
Sets the segment number when E-Cam
engages(segment number of outlined table).
Pr
0
0
~
719
N/A
PC64 ECAX
(■)
E-Cam: master axis position:
Position counter of the E-Cam master axis.
Note: this parameter is only writable when E-Cam
stops (PC66 x=0).
Pr
0
-2
31
+1
~
2
31
-1
Pulse
unit of
master
axis
Содержание SDP Series
Страница 33: ...20 400V series DC 24V Power supply Note terminal P N cannot be grounded ...
Страница 42: ...29 2 CN1 connector male Front view Side view Rear view CN1 wiring terminal on the back of CN1 1 26 50 25 ...
Страница 45: ...32 4 The last step is to fasten the screw of housing ...
Страница 203: ...190 It is recommended that the user performs torque position mode switching after motor is stopped completely ...
Страница 385: ...372 ...
Страница 405: ...392 ...
Страница 499: ...486 SME L040 SME L075 SME L100 SME L150 ...
Страница 500: ...487 SME L200 SME L300 SME M100 SME M150 ...
Страница 509: ...496 When the load reaches 300 the operation time is 5 51 seconds ...
Страница 541: ...528 Middle inertia power cable Middle inertia 2KW 3KW 400V High inertia power cable 1 8KW 2 9KW 4 4KW 5 5KW 7 5KW ...
Страница 555: ...542 14 5 Manual version and revision history Manual version V1 00 Release month July 2022 ...