1.3.11 Configuring a Board................................................................................................................................................71
1.3.11.1 Adding a Board Offline........................................................................................................................................72
1.3.11.2 Confirming a Board..............................................................................................................................................73
1.3.11.3 Checking the Board Status...................................................................................................................................74
1.3.12 Checking the Status of the Upstream Port...............................................................................................................75
1.3.13 Checking the Status of the Service Port..................................................................................................................75
1.3.14 Enabling the ONT Automatic Discovery function..................................................................................................76
1.3.15 Testing the Optical Power of an Optical Port..........................................................................................................76
1.3.15.1 Measuring the Transmit Optical Power of an OLT PON Port.............................................................................76
1.3.15.2 Measuring the Receive Optical Power of an OLT PON Port...............................................................................78
1.3.15.3 Measuring the Transmit Optical Power of an ONU PON Port............................................................................79
1.3.15.4 Measuring the Receive Optical Power of an ONU PON Port..............................................................................81
1.3.16 Commissioning the EMU........................................................................................................................................83
1.3.16.1 Environment Monitoring Application..................................................................................................................83
1.3.16.2 Commissioning the EMU_ESC............................................................................................................................84
1.3.16.3 Configuring H801VESC Environment Monitoring Parameters...........................................................................87
1.3.16.4 Configuring the Environment Monitoring Parameters of the EPS30-4815AF....................................................89
1.3.16.5 Configuring the Environment Monitoring Parameters of the EPS75-4815AF....................................................95
1.3.16.6 Configuring the Environment Monitoring Parameters of the GEPS4845..........................................................103
1.3.16.7 Configuring the Environment Monitoring Parameters of the ETP4830.............................................................109
1.3.16.8 Configuring the Environment Monitoring Parameters of the ETP4890.............................................................115
1.3.16.9 Configuring the Power3000 Environment Monitoring Mode............................................................................120
1.3.16.10 Commissioning the EMU_TCU.......................................................................................................................123
1.3.16.11 Commissioning the EMU_FAN.......................................................................................................................125
1.3.17 Saving and Backing Up Data.................................................................................................................................127
1.3.17.1 Manually Saving and Backing Up Data.............................................................................................................127
1.3.17.2 Configuring the Auto-save and Auto-backup Functions....................................................................................131
1.4 Interconnection Commissioning.................................................................................................................................135
1.4.1 Commissioning the Interconnection with the NMS................................................................................................136
1.4.1.1 Commissioning Outband Network Management (SNMP V1 and V2)................................................................136
1.4.1.2 Commissioning Outband Management (SNMP V3)............................................................................................143
1.4.1.3 Commissioning Inband Management (SNMP V1 and V2)..................................................................................149
1.4.1.4 Commissioning Inband Network Management (SNMP V3)...............................................................................156
1.4.2 Commissioning the Interconnection with the Router..............................................................................................162
1.4.3 Commissioning the Interconnection with the BRAS..............................................................................................163
1.4.4 Interconnection Commissioning of the MG Interface.............................................................................................165
1.4.4.1 Commissioning the Interconnection with the MG Interface(H.248)....................................................................165
1.4.4.2 Commissioning the Interconnection with the MG Interface (MGCP).................................................................168
1.4.5 Commissioning the Interconnection with the SIP Interface....................................................................................171
1.4.6 Commissioning the Management Channel Between the OLT and the GPON MDU.............................................174
1.4.7 Commissioning the Management Channel Between the OLT and the GPON ONT..............................................179
SmartAX MA5600T/MA5603T/MA5608T Multi-service
Access Module
Commissioning and Configuration Guide
Contents
Issue 01 (2014-04-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
vi