Step 2
Hold the ejector lever of the fan tray and remove the fan tray from the service shelf, as shown
in (2) of
Step 3
Check whether the settings of DIP switches on the fan monitoring board are consistent with the
application. If settings of DIP switches on the fan monitoring board are not consistent with the
application, set the DIP switches again according to "Description of DIP Switches".
Step 4
Insert the fan tray into the slot, as shown in (3) of
Step 5
Use the Phillips screwdriver to fasten the panel screws clockwise on the fan tray, as shown in
(4) of the
----End
Result
The settings of DIP switches on the fan monitoring board are consistent with the application.
1.3.2 Powering On the Device
This topic describes how to power on the device to ensure that all the boards can be normally
powered on.
Prerequisites
The after-installation check and the power-on check must be performed on the device.
Context
NOTICE
Inserting or removing boards is prohibited during startup.
Procedure
l
There are two kinds of devices: the indoor device and the outdoor device.
–
Powering on the indoor device
1.
Connect the input power supply of the DC PDU.
2.
Turn on the output control switch of the DC PDU.
–
Powering on the outdoor device
1.
Connect the input power supply of the AC PDU.
2.
Turn on the output control switch of the AC PDU.
3.
Turn on the output control switch of the power system.
4.
Turn on the output control switch of the DC PDU.
----End
SmartAX MA5600T/MA5603T/MA5608T Multi-service
Access Module
Commissioning and Configuration Guide
1 Commissioning
Issue 01 (2014-04-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
16