GE Analytical Instruments ©2016
222 of 270
DLM 68100-09 EN Rev. A
Chapter 9: Troubleshooting
• Reactor Flow Control Valves (V6-R) and (V3-R) are closed
• Reactor Valve (V7-R) is opened
• Proportional valve (V1-GD) is set to its normal set point for the carrier gas flow
Pneumatic Valves
The
Pneumatic Valve
screen (
) contains buttons for testing the pneumatic valves, which control the
optional Filter Panel.
To test a pneumatic valve, first ensure that the source of compressed air is connected to the Analyzer. Press the
appropriate button for the pneumatic valve to test. The pneumatic valves are identified with a “PV” prefix
followed by the position number. For example, “PV1-MS” refers to the pneumatic valve in position 1, “PV2-MS”
refers to the pneumatic valve in position 2, and so on. The state of the valve appears as “1” (active or open) or
“0” (inactive or closed) on the button under the valve name.
After pressing a pneumatic valve button, you should hear compressed air exit from the selected valve. (The
pneumatic valves are mounted on the left side of the Analyzer).
Figure 96: Pneumatic Valve Screen
N
OTE
:
The pneumatic valves information included in this section only applies if the Analyzer
is configured for use with the Filter Panel.
Содержание Sievers Innovox
Страница 214: ...GE Analytical Instruments 2016 214 of 270 DLM 68100 09 EN Rev A Chapter 9 Troubleshooting Figure 88 Analyzer Schematic ...
Страница 235: ...GE Analytical Instruments 2016 235 of 270 DLM 68100 09 EN Rev A Chapter 9 Troubleshooting Figure 104 Reactor Leak Check ...
Страница 248: ...GE Analytical Instruments 2016 248 of 270 DLM 68100 09 EN Rev A Figure 112 Analyzer Dimensions Right Side View ...
Страница 249: ...GE Analytical Instruments 2016 249 of 270 DLM 68100 09 EN Rev A Figure 113 Analyzer Dimensions Left Side View ...
Страница 250: ...GE Analytical Instruments 2016 250 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 258: ...GE Analytical Instruments 2016 258 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 264: ...GE Analytical Instruments 2016 264 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 268: ...GE Analytical Instruments 2016 268 of 270 DLM 68100 09 EN Rev A Index ...
Страница 269: ...GE Analytical Instruments 2016270 269 of 270 DLM 68100 09 EN Rev A Notes ...
Страница 270: ...GE Analytical Instruments 2016270 270 of 270 DLM 68100 09 EN Rev A Notes ...