GE Analytical Instruments ©2016
171 of 270
DLM 68100-09 EN Rev. A
Chapter 6: Analyzer Operation
To resume Analyzer Operation
When you are ready to resume operation after shutting down the Analyzer, follow these steps:
1. Ensure that AC power is connected and the power switch is in the
On
position.
2. Press the touchscreen to start the Analyzer.
Checking the Software Version
You can view the software version of the Analyzer for your reference or to aid in troubleshooting activities.
To check to the software version
1. Select the
Maintenance
tab.
2. Press the
Software Version
button.
The main software version appears on top. (This is the same version number that displays when the
Analyzer starts up.) The embedded software versions of the different modules in the Analyzer also
appear.
Содержание Sievers Innovox
Страница 214: ...GE Analytical Instruments 2016 214 of 270 DLM 68100 09 EN Rev A Chapter 9 Troubleshooting Figure 88 Analyzer Schematic ...
Страница 235: ...GE Analytical Instruments 2016 235 of 270 DLM 68100 09 EN Rev A Chapter 9 Troubleshooting Figure 104 Reactor Leak Check ...
Страница 248: ...GE Analytical Instruments 2016 248 of 270 DLM 68100 09 EN Rev A Figure 112 Analyzer Dimensions Right Side View ...
Страница 249: ...GE Analytical Instruments 2016 249 of 270 DLM 68100 09 EN Rev A Figure 113 Analyzer Dimensions Left Side View ...
Страница 250: ...GE Analytical Instruments 2016 250 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 258: ...GE Analytical Instruments 2016 258 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 264: ...GE Analytical Instruments 2016 264 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 268: ...GE Analytical Instruments 2016 268 of 270 DLM 68100 09 EN Rev A Index ...
Страница 269: ...GE Analytical Instruments 2016270 269 of 270 DLM 68100 09 EN Rev A Notes ...
Страница 270: ...GE Analytical Instruments 2016270 270 of 270 DLM 68100 09 EN Rev A Notes ...