GE Analytical Instruments ©2016
194 of 270
DLM 68100-09 EN Rev. A
Chapter 8: Maintenance
Replacing the High Pressure Valve Seals
The Sievers InnovOx Online TOC Analyzer has two high pressure valves (V4-R and V5-R). These valves are
identified in
. Each valve contains a seal that wears over time. The seals should be replaced
after one month of operation. The Analyzer issues a warning when the seals are starting to leak. Replace the
seals using the following procedure if that warning is reported.
To replace the seals
1. Shut down the Analyzer via the on-screen menu (
Maintenance
Shutdown
).
2. Wait for the display to turn off, and then off power to the Analyzer using the main power switch on the
side of the Analyzer.
3. Open the door of the Analyzer.
4. Remove the four screws that secure the valve motor to the Analyzer, using a 5/32 in. Allen wrench (hex
key).
5. Pull the motor away from the Analyzer (
). The seal is threaded on the motor shaft.
6. Remove the seal from the end of the shaft, using a 3/8 in wrench (
and
).
7. Locate the new seal and inspect the valve seating surface. Clean the valve seal surface with a paper
towel and water, if needed.
8. Secure the new seal to the end of the valve shaft, and then using a 3/8 in. wrench tighten the seal 1/4
turn past finger-tight. Do not over-tighten the seal.
9. Replace the motor and secure it with the four screws.
10. Repeat steps
through
for the other motor. Always replace both seals.
11. Perform other maintenance tasks, or close the Analyzer door and return the Analyzer to normal
operation.
12. The seals must be used before they conform to the shape of the sealing surface in the valves. They will
have to operate for at least 20 measurements before the Analyzer will achieve its maximum precision.
Warning
Wear eye protection and gloves when performing this task.
Содержание Sievers Innovox
Страница 214: ...GE Analytical Instruments 2016 214 of 270 DLM 68100 09 EN Rev A Chapter 9 Troubleshooting Figure 88 Analyzer Schematic ...
Страница 235: ...GE Analytical Instruments 2016 235 of 270 DLM 68100 09 EN Rev A Chapter 9 Troubleshooting Figure 104 Reactor Leak Check ...
Страница 248: ...GE Analytical Instruments 2016 248 of 270 DLM 68100 09 EN Rev A Figure 112 Analyzer Dimensions Right Side View ...
Страница 249: ...GE Analytical Instruments 2016 249 of 270 DLM 68100 09 EN Rev A Figure 113 Analyzer Dimensions Left Side View ...
Страница 250: ...GE Analytical Instruments 2016 250 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 258: ...GE Analytical Instruments 2016 258 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 264: ...GE Analytical Instruments 2016 264 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 268: ...GE Analytical Instruments 2016 268 of 270 DLM 68100 09 EN Rev A Index ...
Страница 269: ...GE Analytical Instruments 2016270 269 of 270 DLM 68100 09 EN Rev A Notes ...
Страница 270: ...GE Analytical Instruments 2016270 270 of 270 DLM 68100 09 EN Rev A Notes ...