GE Analytical Instruments ©2016
238 of 270
DLM 68100-09 EN Rev. A
Chapter 9: Troubleshooting
To perform the (Check 6) Gas-Liquid Separator, NDIR Filter, NDIR Sample Path and Sparger
Leak Check
1. Ensure that the NDIR is plugged, as described in the
Before You Begin
section.
2. Pull the pinch valve tubing out of V7-R. Refer to
for instructions on how to open
the valve to facilitate removal of the tubing.
3. Place a clamp on the Gas-Liquid Separator (GLS) waste line (the tube that extends from the Gas-Liquid
Separator and out of the Analyzer). The GLS will pressurize slightly during this test; ensure that it is
installed correctly and its bracket screw is fastened securely.
4. On the
Gas Leak Check
screen, press the
Reactor Bypass
button to start the test. The Analyzer closes
the following valves: V1-R, V3-R, V4-R, V5-R, V7-R, and V7-SH. The Analyzer opens valves V2-R and V6-R.
5. The Gas Control Module pressurizes the lines for 24 sec., and then valve V1-GD closes to trap the
pressure in the area being tested and the system holds for an additional 15 sec. If a major leak is
detected at this time, an "Analyzer failed to pressurize" warning appears and the test will end. During
this 39-sec. pressurization period, the timer remains at 00:00 and "Pressurizing . . ." appears under the
timer.
6. When the system passes pressurization, the leak check begins, the timer starts, and "Testing . . ."
appears under the timer. The test lasts for 60 sec. The test passes if the drop in pressure is <= 2.0 psi.
7. If the test fails, but all previous Leak Tests passed, check the fittings and tubing at the Gas-Liquid
Separator, NDIR Filter, and Sparger.
8. Remove the clamp from the GLS waste tube. Reinstall the pinch tubing into V7-SH.
9. Remove the plug on the NDIR end cap outlet gas line.
Содержание Sievers Innovox
Страница 214: ...GE Analytical Instruments 2016 214 of 270 DLM 68100 09 EN Rev A Chapter 9 Troubleshooting Figure 88 Analyzer Schematic ...
Страница 235: ...GE Analytical Instruments 2016 235 of 270 DLM 68100 09 EN Rev A Chapter 9 Troubleshooting Figure 104 Reactor Leak Check ...
Страница 248: ...GE Analytical Instruments 2016 248 of 270 DLM 68100 09 EN Rev A Figure 112 Analyzer Dimensions Right Side View ...
Страница 249: ...GE Analytical Instruments 2016 249 of 270 DLM 68100 09 EN Rev A Figure 113 Analyzer Dimensions Left Side View ...
Страница 250: ...GE Analytical Instruments 2016 250 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 258: ...GE Analytical Instruments 2016 258 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 264: ...GE Analytical Instruments 2016 264 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 268: ...GE Analytical Instruments 2016 268 of 270 DLM 68100 09 EN Rev A Index ...
Страница 269: ...GE Analytical Instruments 2016270 269 of 270 DLM 68100 09 EN Rev A Notes ...
Страница 270: ...GE Analytical Instruments 2016270 270 of 270 DLM 68100 09 EN Rev A Notes ...