GE Analytical Instruments ©2016
245 of 270
DLM 68100-09 EN Rev. A
Chapter 9: Troubleshooting
1. If the Analyzer is making measurements, press the
Stop Analysi
s
button. Then press
Yes
to confirm you
want to stop the analysis.
2. Remove the sample inlet line(s) from the left side of the Analyzer.
3. Flush all lines. Place all four tubes on the left side of the Analyzer (acid, oxidizer, check standard, and
dilution water) into a container of DI water. Select
Menu
Maintenance
Flush Reagents
Flush All
.
4. Remove the four tubes from the DI water and then press the
Flush All
button again to drain water from
the Analyzer’s lines.
5. Remove the reagent tubes, Check Standard tube, and the tube to the dilution water from the left side of
the Analyzer.
6. Turn off the compressed gas. Remove the gas tube from the Gas Inlet on the side of the Analyzer.
7. Select the
Maintenance
tab, and press
Shutdown
.
8. When the display is dark, turn off the power switch and unplug the conduit.
9. Open the door of the Analyzer.
10. Wearing eye protection and rubber gloves, remove the tubes from the Gas-Liquid Separator. Unscrew
the bracket, and remove the Gas-Liquid Separator from the Analyzer.
11. Drain the Gas-Liquid Separator by turning it over. It is acceptable for the Gas-Liquid Separator to
contain a few drops of liquid.
12. Reinstall the Gas-Liquid Separator.
13. Close the door on the Analyzer.
You can now repackage the Analyzer and ship it to GEAI.
For international shipments, coordinate with a representative to ensure quick passage through customs.
N
OTE
:
The Check Standard MUST be in the
Enabled
state. To verify this, on the
Setup
tab,
press the
Check Standard
button and then press the
Check Standard Setup
button.
Verify that the
Check Standard
button appears as “Enabled.” If this feature is disabled,
press the
Check Standard
button, and then press the
Enabled
button to the right.
Содержание Sievers Innovox
Страница 214: ...GE Analytical Instruments 2016 214 of 270 DLM 68100 09 EN Rev A Chapter 9 Troubleshooting Figure 88 Analyzer Schematic ...
Страница 235: ...GE Analytical Instruments 2016 235 of 270 DLM 68100 09 EN Rev A Chapter 9 Troubleshooting Figure 104 Reactor Leak Check ...
Страница 248: ...GE Analytical Instruments 2016 248 of 270 DLM 68100 09 EN Rev A Figure 112 Analyzer Dimensions Right Side View ...
Страница 249: ...GE Analytical Instruments 2016 249 of 270 DLM 68100 09 EN Rev A Figure 113 Analyzer Dimensions Left Side View ...
Страница 250: ...GE Analytical Instruments 2016 250 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 258: ...GE Analytical Instruments 2016 258 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 264: ...GE Analytical Instruments 2016 264 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 268: ...GE Analytical Instruments 2016 268 of 270 DLM 68100 09 EN Rev A Index ...
Страница 269: ...GE Analytical Instruments 2016270 269 of 270 DLM 68100 09 EN Rev A Notes ...
Страница 270: ...GE Analytical Instruments 2016270 270 of 270 DLM 68100 09 EN Rev A Notes ...