GE Analytical Instruments ©2016
88 of 270
DLM 68100-09 EN Rev. A
Chapter 4: Installation
Due to a significant variance among USB devices, not all USB flash memory devices are compatible with the
Analyzer. For a list of known compatible USB flash memory drives, access the FAQs for Sievers TOC Analyzers
under the Support tab on our website,
www.GEInstruments.com
.
To attach the USB flash memory drive, unscrew the cover from the USB port on the left side of the Analyzer. Then
slide the USB flash memory drive into the port. The drive must be oriented properly to slide in. Allow several
seconds for the Analyzer to recognize the device. Reattach the cover when the export is complete and the USB
flash memory drive is removed
.
Step 7: Connecting to a Power Supply
Installation of the Sievers InnovOx On-Line TOC Analyzer requires an external source of AC power connected to
the enclosure using a watertight, grounded conductive conduit connector. A qualified electrician should make
the electrical connections according to local Electrical Code. An external switch or circuit breaker is required to
facilitate maintenance and servicing of the Analyzer. It should be installed near the Analyzer and be clearly
marked as the disconnecting device for the Analyzer.
Remove the pass-through cap from the port labeled
AC INLET
on the right side of Analyzer. Secure the PVC
conduit connector (“strain relief” hub) and washer to the conduit and the Analyzer panel in the normal manner.
Route the AC power conduit through the pass-through port. AC connections inside the Analyzer are made to the
top of the terminal block (
), with the line (brown/black wire) connected to the terminal block, and
neutral (blue/white wire) connected to the position marked
NEUTRAL
. Connect the grounding conductor (green
and yellow wire) to the ground stud. A terminal ring for 16-14 AWG wire is provided in the accessories kit; if you
use wire of a different gauge, you must provide an appropriate terminal ring.
Wire should be 18-12 AWG, rated to 300 Volts. Strip length should be 8-9 mm (0.33 in). When connecting the wire
to the terminal block, use a small flathead screwdriver to tighten the wire into the terminal. After connecting the
wire, pull on each connection gently to make sure the connection is secure.
Metallic conduit is required for the Analyzer to meet CE Mark electrical requirements.
When the power wiring is complete, reattach the top access cover on the Analyzer.
N
OTE
:
Before installing any wiring inside the Analyzer, put on a grounding strap for ESD protection.
Содержание Sievers Innovox
Страница 214: ...GE Analytical Instruments 2016 214 of 270 DLM 68100 09 EN Rev A Chapter 9 Troubleshooting Figure 88 Analyzer Schematic ...
Страница 235: ...GE Analytical Instruments 2016 235 of 270 DLM 68100 09 EN Rev A Chapter 9 Troubleshooting Figure 104 Reactor Leak Check ...
Страница 248: ...GE Analytical Instruments 2016 248 of 270 DLM 68100 09 EN Rev A Figure 112 Analyzer Dimensions Right Side View ...
Страница 249: ...GE Analytical Instruments 2016 249 of 270 DLM 68100 09 EN Rev A Figure 113 Analyzer Dimensions Left Side View ...
Страница 250: ...GE Analytical Instruments 2016 250 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 258: ...GE Analytical Instruments 2016 258 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 264: ...GE Analytical Instruments 2016 264 of 270 DLM 68100 09 EN Rev A This page is intentionally left blank ...
Страница 268: ...GE Analytical Instruments 2016 268 of 270 DLM 68100 09 EN Rev A Index ...
Страница 269: ...GE Analytical Instruments 2016270 269 of 270 DLM 68100 09 EN Rev A Notes ...
Страница 270: ...GE Analytical Instruments 2016270 270 of 270 DLM 68100 09 EN Rev A Notes ...