
8A
la
rm
DX100
8.3
A
la
rm Me
ssa
ge List
8-302
YCP01 board failure (1)Turn the power OFF then back ON.
(2)If the alarm occurs again, replace the YCP01 board. Save the CMOS.BIN
before replace the board to be safe. Replace the YCP01 board, and then
insert the CF card which inserted original YCP01 board into the new YCP01
board.
8
An error occurred in the re-
initialization response receiving
process of the Ethernet function.
Software operation
error occurred
(1)Turn the power OFF then back ON.
(2)If the alarm occurs again, save the CMOS.BIN in maintenance mode, and
then contact your Yaskawa representative about occurrence status
(operating procedure).
YCP01 board failure (1)Turn the power OFF then back ON.
(2)If the alarm occurs again, replace the YCP01 board. Save the CMOS.BIN
before replace the board to be safe. Replace the YCP01 board, and then
insert the CF card which inserted original YCP01 board into the new YCP01
board.
9
Receiving data size error occurred
in the re-initialization response
receiving process of the Ethernet
function.
Software operation
error occurred
(1)Turn the power OFF then back ON.
(2)If the alarm occurs again, save the CMOS.BIN in maintenance mode, and
then contact your Yaskawa representative about occurrence status
(operating procedure).
YCP01 board failure (1)Turn the power OFF then back ON.
(2)If the alarm occurs again, replace the YCP01 board. Save the CMOS.BIN
before replace the board to be safe. Replace the YCP01 board, and then
insert the CF card which inserted original YCP01 board into the new YCP01
board.
30
An error occurred in the Web
server task mail receiving process
of the Ethernet function.
Software operation
error occurred
(1)Turn the power OFF then back ON.
(2)If the alarm occurs again, save the CMOS.BIN in maintenance mode, and
then contact your Yaskawa representative about occurrence status
(operating procedure).
Alarm
Number
Alarm Name
Sub
Code
Meaning
Cause
Remedy